A-A-51127A
4.4 Dimensional inspection. Each holder submitted for sample inspection shall be inspected to assure conformance with all dimensional and tolerance requirements specified herein.
4.5 Hardness test. After the sample inspection has been completed, a hardness test shall be performed on 10 percent of the sample holders, If any of the test samples fail to meet the applicable hardness specified herein, the total lot from which the samples were selected shall be rejected.
4.6 Packaging inspection. Packaging shall be inspected for conformance with section 5.
5. PACKAGING.
5.1 Preservation, packing, and marking. Unless otherwise specified in the contract or purchase order preservation, packing, and marking shall be in accordance with ASTM D 3951. When specified (see 6.1) preservation, packing, and marking shall be in accordance with PPP-P-40, level as specified.
6. NOTES
6.1 Ordering data. Purchasers should select the preferred options permitted herein, and include the following information in procurement documents:
a. Title, number, and date of this commercial item description.
b. Type, size, and quantity required (see 1.2).
c. Packaging in accordance with PPP-P-40 if required, specify level (see 5.1).
6.2 Cross reference data. The tool holder numbers in tables I and II were changed to tool holder sizes. This was done to make the tables compatible to the PIN numbers. Table IV, the sampling plan, was condensed and modified to comply with quality requirements.
6.3 CID based part identification number. The following part identification numbering procedure is for Government purposes and does not constitute a requirement for the contractor. Where applicable Arabic numbers shall be substituted for Roman numberals.
A51127A X X
A51127A- CID number
X- Type (see 1.2)
X- Size (see table I or II)
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business